Deerfield Beach CNG Fueling Station
Project Description
Designed a dual-function CNG fueling station for the city’s CNG powered fleet vehicles, featuring overnight time-fill for 36 trucks and a fill post for daytime use. The station included two 300 scfm compressors, a 600 scfm gas dryer, CNG storage vessels, priority panel, and 36 time-fill posts. Provided detailed engineering, equipment specifications, and post-design support for permitting/regulatory approvals and construction.
Services Provided
- Process Engineering
- Mechanical Engineering
- Electrical Engineering
- Market
- Client
- Location