Double Eagle Pipeline Hydraulic Solutions
Project Description
AEDES provdied engineering and design services for the installation of mainline and booster pumps at two established condensate production facilities as part of a Kinder Morgan project. The primary goal was to augment the flow rate capacity of two central delivery point stations, thereby enhancing the overall delivery of natural gas liquids into the Double Eagle pipeline system near Three Rivers, TX.
Services Provided
- Civil Engineering
- Structural Engineering
- Mechanical Engineering
- Electrical Engineering
- Instrumentation and Controls Engineering
- Market
- Client
- Location