Escondido CNG Fueling Station

Project Description

AEDES designed a fast-fill CNG fueling station tailored to meet the needs of EDCO's CNG-powered refuse and long-haul trucks. Our services included detailed design drawings, equipment specifications, and comprehensive technical support throughout the permitting and construction phases. The station features two electric-motor driven compressors, a single-tower gas dryer with a semi-automatic regeneration system, a priority-sequencing control valve panel, six CNG storage spheres, two fast-fill dispensers, and a sophisticated fuel management system.

Services Provided

  • Electrical Engineering
  • Mechanical Engineering
  • Structural Engineering
Return to Projects
  • MarketNatural Gas
  • ClientEDCO
  • LocationCalifornia